Weekly schedule reporting and update-to-update comparisons
A weekly package that answers the same questions every week: what changed since the last export, which milestones moved against the baseline and the prior update, and what the field can start next.
Problems this solves
- Each week's export is compared with last week's by hand.
- Milestone variance is reported against different references in different reports.
- Activities added, removed or renamed between exports go unnoticed.
- Leadership wants a short walk-through, not a 40-column spreadsheet.
What the work covers
Update comparison
Exports matched by Activity ID with added, removed and changed activities, and the field that changed.
Milestone variance
Finish dates against BL (original baseline), BL1 (prior update) and BL2 (current update), in working days, with comments carried forward.
Look-ahead and Ready to Start
Two-, four- and twelve-week look-aheads, and the activities whose predecessors are complete.
Narrated update reviews
A recorded walk-through of the weekly review for people who cannot attend the meeting.
Typical deliverables
- Weekly report set from one export
- Change log with the reason each activity appears
- Milestone variance by level with prior comments
- Optional narrated review video
How the work runs
- Receive the authorized export. One export per reporting period, with its data date.
- Compare with the prior update. Matched by Activity ID: added, removed and changed activities, and milestone movement against BL1 and BL.
- Build the package. Look-aheads, Ready to Start, milestone variance and carried-forward comments, in the same layout every week.
- Review and narrate. A short walk-through for leadership, recorded if needed.
See a working demonstration
Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.
- Open the Weekly Export to Report demonstrationThree preloaded weekly exports of one fictional schedule: load a week, compare it with the prior week by Activity ID, and…
- Open the Weekly Reporting Package demonstrationThe weekly report set from one P6 export: Milestone Variance by level, 1-Week Look-Back, 2-Week and 12-Week Look-Ahead with a…
- Open the Update Compliance & Comment Gaps demonstrationLists open activities that were not statused and carry no comment this update, by workstream manager and supervisor, with new and…
- Open the Look-Ahead & Ready to Start demonstrationTwo- and four-week look-ahead from the data date with predecessor status and discipline filters. Ready to Start uses the original…
Watch it working
A narrated walk-through of a weekly schedule update review for the fictional Topside Module TM-7: changes since the last export, negative float, the four-week look-ahead, slipped activities and activities that left the export. Fictional project, synthetic data.
Read the transcript
This is the schedule update review for Topside Module T M 7, for the meeting on Monday, November ninth. It's presented by McKowen Project Controls.
The review uses the November ninth export from the project schedule.
The data date is still November second. The schedule wasn't advanced for this meeting, so dates and progress haven't changed.
There are a hundred and sixty-four activities: forty-one in progress, and a hundred and twenty-three not started. Nothing was added or removed since the last export.
Only five activities changed between the two exports.
Three cable tray activities lost eight days of total float, from four hundred twelve down to four hundred four. They still carry a lot of positive float.
One of them, the deck four tray installation, was also renamed to include the cable supports.
The other two changes are renamed contract award milestones: the hydrotest pump package, and the deck crane load test services.
One activity is on negative float.
The pressure vessel nozzle load check is at minus fifteen days of total float. It hasn't started, and it's the same activity we flagged on November second.
That's the main item to confirm with the owner today: the start plan, and any recovery options.
In the four weeks from the data date, November second through the twenty-ninth, seventy-nine activities have work scheduled.
Supervisors, please confirm these dates before the next data date update.
The weekly comparison is in the Weekly Summary.
Compared with November second, the counts are the same. Nothing slipped this week, because the data date didn't move.
The nine slips in the previous column came from the October nineteenth to November second update.
Four activities need attention: the negative-float nozzle check, and the three cable tray activities that lost float.
Upcoming milestones: the compressor skid vendor drawings on November ninth, the hull interface review on the thirteenth, the piping isometrics on the sixteenth, and the E and I supplier selection on the seventeenth.
The two supply agreements, for the deck crane and the pressure vessels, are forecast for December fourth.
To review the last update's slips, select the November second snapshot.
Activities that finished later than the previous export show in red.
Select one to see its history. The compressor skid drawings moved eighteen days, to November ninth.
Nine activities slipped in that update, each by ten to eighteen days. None have moved since.
Twenty-two activities left the review export on November second. They stay on this list until each one is marked finished or removed.
The full schedule confirms that nine of them are complete, with actual finish dates, so they're marked finished.
The other thirteen are still open in the full schedule. They dropped out of the review export, and they need a decision.
The full schedule also gives a health check on the review activities.
Two open activities have no predecessor, three have no successor, and five carry a constraint. These will be reviewed with the owners.
Next steps: confirm the nozzle check recovery plan, confirm the four-week look-ahead, and decide on the thirteen activities still open in the full schedule.
Comments from this meeting will be recorded against each activity.
Thank you. We'll take questions now.