Forensic schedule and delay analysis

When a milestone moves, the question is which activity moved it and through which logic. The analysis traces the driving path backward relationship by relationship and compares each update with the one before.

Problems this solves

What the work covers

Slip analysis

Activities matched by Activity ID across updates, ranked by finish movement, with the field that changed.

Driving-path tracing

The predecessor with the least relationship float at each step, with relationship type, lag and dates shown as evidence.

Near-driving paths

Relationships within a set number of days of driving, so a second path is not missed.

Recovery scenarios

A proposed change scheduled through the network and the milestone re-forecast from the result.

Typical deliverables

This work supports project teams and their advisers. McKowen Project Controls does not provide legal opinions or expert-witness testimony.

How the work runs

  1. Collect the updates in order. Each schedule update identified by its data date, so every comparison is between consecutive snapshots.
  2. Find what moved. Activities matched by Activity ID; finish movement ranked by update and against the original baseline.
  3. Trace the cause. The driving path from the late milestone back to its first open driver, with the relationship evidence.
  4. Test recovery options. Each option scheduled through the network, with the milestone it recovers and by how much.

See a working demonstration

Each demonstration opens on the home page with a fictional project and synthetic data. Sort, filter and drill into the records.

Watch it working

A narrated screen recording of the Logic Tracer on a synthetic schedule: a late milestone traced back to its driving activity, the logic map, near-driving paths, the Gantt view and a recovery scenario. Fictional project, synthetic data.

Read the transcript

The Logic Tracer starts from a milestone. Ready for Startup is selected.

Trace Path walks backward through the current update, choosing at each step the predecessor with the least relationship float.

The first open activity on the path is the residue gas compressor delivery, ten working days later than the prior update: that is the root cause. Its details show the evidence, a finish-to-start link to its successor with zero relationship float. The slip carries forward, and Ready for Start-up is now seven working days later than the prior update.

The logic map shows the same chain as boxes, each with its dates and total float.

Near-driving paths check for any relationship within ten days of driving. In this update there are none, so this path alone sets the milestone.

The Gantt view lines the path up against the prior update, and the data date.

The recovery scenario re-sequences the hydrotest. The whole path is scheduled again, and the milestone recovers three working days.