Schedules you can see being built.
Primavera P6 activities linked to a 3D construction model, and the reporting software project teams use each week.
Explore Interactive 4D Model
4D Simulation
Levels and disciplines are separate controls. Select an activity to find its geometry, or an object to find its activities.
A demonstration on a fictional facility with a synthetic schedule. The model and schedule are bundled with the page; nothing is loaded from visitors. Models are for planning and communication, not engineering design.
4D construction video: offshore production module
Ninety seconds of a fictional topside module built in a fabrication hall against its schedule: foundations, frame and decks, the heavy lift of the production separator, compressors, piping, cable trays, outfitting and pre-commissioning. The schedule is shown as a sequence of weekly updates. Each update sets a new data date, the reporting cutoff the schedule was statused to; the Activities table, the bars and the blue data-date line refresh to that update, and the model then builds out the work reported through it.
Fictional module and synthetic schedule, not a real client project. The interactive model above and the reporting demonstrations below are separate, live tools; this is a rendered video.
Reporting Technology
Software that shows why the schedule moved and what is due next. Twenty-four working applications on synthetic data, each opening full screen. The nine reports featured in the portfolio video come first, in the order they appear there.
Baselines and sign conventions
- BL
- Original approved baseline.
- BL 1 (BL1)
- Prior update (update 11, data date 19-Oct-26).
- BL2
- Current update (update 12, data date 16-Nov-26).
- Prior Period Finish VAR
- Prior update (BL1) finish minus current (BL2) finish. In the P6 schedule view this is the optional BL 1 Finish Variance column.
- BL Variance
- Original baseline (BL) finish minus current (BL2) finish. Called BL Finish Date VAR in the weekly reports. It is not the prior-update variance.
- Sign
- Working days. Negative means the current date is later (behind); positive means earlier (ahead); 0 means no change.
Weekly reporting, built for the client's own environment
Each report below opens at once with bundled synthetic data: sort, filter, drill into any activity, and change the update or the view. A guided walkthrough steps through the report with spoken commentary, which can be turned off in the player.
For authorized client deployments, standalone HTML reporting applications can be configured to analyze weekly Primavera P6 exports in the client's own controlled environment. Each is built and tested against that client's exports and process; this public site reads no schedule files.
- Current update against the prior updateActivities matched by Activity ID: added, deleted and changed, with the field that changed.
- Milestones against the baselineBL, BL1 and BL2 finish dates with variance in working days.
- Why a date movedThe driving chain behind any activity, step by step.
- What the field can startReady to Start from predecessor logic, reconciled update to update.
All demonstration data is synthetic: a fictional gas processing project.
- Critical Path AnalysisIntegrated key-activity schedule, milestone forecast against BL 1, and the plan, impact and recovery scenarios.
- Weekly Schedule ReviewOne P6 export in, the weekly package out: import and validation, changes, milestones, comments carried forward.
- Project Controls DashboardArea, discipline and update slicers; KPI cards and charts that drill to the source activities.
- Schedule Quality & LogicQuality checks, then the driving path traced from the late delivery to the milestones.
- Milestone VarianceBaseline, prior period, current and recovery forecast, with why each milestone moved.
- Look-Ahead & Ready to StartTwo- and four-week windows, predecessor status, constraints and the weekly reconciliation.
- Earned-Hours DashboardPV, EV and AC in hours, with SV, CV, SPI and CPI, drilling to work packages.
- Subcontract Awards TrendOpen awards by month and discipline, slips, improvements and awards at risk.
- Deliverables BurndownOpen deliverables at each week end: original scope and change orders against the baseline.
Logic Tracer in action (video)
A narrated walkthrough of the Logic Tracer on a synthetic schedule. Ready for start-up is selected, its driving path is traced backward relationship by relationship to the late compressor delivery, the same path is shown as a logic map and a Gantt, and a recovery scenario re-schedules the path and re-forecasts the milestone.
Weekly Schedule Update Video Reporting
A narrated walk-through of a weekly schedule update, recorded from the review report itself: what changed since the last export, what is on negative float, what the field has to confirm in the next four weeks, which activities slipped in the last update, and which ones left the export and need a decision.
Fictional Topside Module TM-7 with synthetic schedule data, 4 minutes 37 seconds. Open the same review report and step through it yourself.
Narrated weekly briefings like this one can be prepared for a client's own schedule on request, from the client's authorized exports, and billed at the same hourly rate as every other service.
Custom Level One Schedule Applications
A Level One schedule built as a working application rather than a static chart: swimlanes for each part of the project, every bar labeled with its start and finish milestones, the driving ties between them, and separate Present and Review modes for the meeting room and the working session.
The demonstration uses the fictional Topside Module TM-7. A client version is built on the client's own Level One logic and delivered as a single file that opens in a browser, with no server. Ownership of the delivered application and its source files is set out in the signed agreement, subject to any third-party or open-source licenses. It is billed at the same $195 hourly rate as every other service.
Services
McKowen Project Controls, LLC is an independent consulting and technology services firm in Houston, Texas. We plan and control capital projects in Primavera P6 and build the software that makes the schedule visible: 4D models, analysis tools and weekly reporting systems.
4D construction simulation
Schedule-linked models for sequencing, constructability reviews and progress communication. Every modeled object carries an Activity ID, so levels, disciplines and packages can be played, compared and questioned.
Schedule analysis software
Forensic slip analysis, logic tracing, milestone variance across BL, BL1 and BL2, update trends and quality diagnostics, delivered as offline applications that run on each new P6 export.
Weekly reporting systems
Validated weekly updates, week-over-week change tracking, resource and workstream reporting and control-room dashboards that a project team runs without a programmer.
Planning, scheduling and schedule reviews
Baselines, integrated master schedules, updates and recovery schedules, and independent reviews of contractor baselines and updates with delay analysis support.
Our applications run offline in the browser; a client's schedule stays on the client's machines. We do not issue engineering design deliverables, legal opinions or expert-witness testimony.
Pricing
Consulting is billed by the hour against prepaid service credit, with an itemized record of every hour. Custom software and 4D modeling are priced by proposal.
$195/hour
The rate includes the company's provision for business income taxes; no separate tax surcharge is added. Sales or other transaction taxes, where legally required, are calculated and shown separately.
Custom software and 4D modeling
Custom HTML reporting applications, integrations, forensic schedule investigations and 3D/4D construction models are priced by written proposal, based on scope, deliverables and complexity.
Request a Proposal- Prepaid service credit
$15,600
80 hours at $195, paid before work begins. Work is billed against the credit with a time report itemized by date, task and hours.
- Notice at 20 hours remaining
When 20 prepaid hours are left, you are notified with the balance and the work planned for those hours. Nothing is billed or topped up automatically.
- Additional hours, approved in writing
After the credit is used, further hours are worked only with your written approval. Approved hours are invoiced every two weeks, and payment is due on each two-week invoice.
A smaller introductory engagement can be arranged; its scope and price are set out in writing before any work starts.
Billing practices
- Itemized time reports with every invoice: date, task and hours.
- Prepaid hours used and remaining shown on each report.
- Written approval before any work outside the agreed scope.
- Travel, lodging, specialized software licenses and third-party expenses only with prior written approval.
- No undisclosed charges.
- The treatment of any unused prepaid balance is set out in the signed agreement.
Payment Methods
Accepted payment methods: Bitcoin (BTC), Ethereum (ETH), Monero (XMR), cashier’s check, and bank wire transfer. No other payment methods are accepted.
- Bitcoin BTCSent only after the network, amount and destination are confirmed with us for that invoice.
- Ethereum ETHConfirmed network and amount before any transfer; the receipt references the transaction.
- Monero XMRSame confirmation step as other cryptocurrency payments; receipted like any other payment.
- Cashier's checkPayable to McKowen Project Controls, LLC; mailing instructions are on the invoice.
- Bank wire transferDomestic or international wire using the verified instructions printed on the invoice.
- Verified payment instructions are provided only on each invoice. No wallet addresses or bank details are published on this site.
- Every payment, whatever the method, is invoiced, receipted and recorded, and remains subject to applicable tax, invoicing and recordkeeping requirements.
Rates and billing terms above are LLC-to-client consulting terms and apply under a signed agreement between McKowen Project Controls, LLC and the client.
Contact
Tell us about the project and the decision you need to make. For a fixed deadline, such as a bid or a recovery schedule, choose "Urgent schedule work".
Houston, Texas. Remote or on site by arrangement.
Confidential by default
- Work is done from exports you authorize, for the purpose agreed in writing.
- Reporting applications run in your own environment; this website never receives your schedules.
- Your data is not sold or used for advertising. Swiss-hosted encrypted storage is our preferred arrangement for project files, subject to your requirements and to implementation.